As a subcontractor to the joint venture (Contratas Vilor – CICASA – CRC), INGECID provided BIM consultancy services during the execution of the works, with FGV (Ferrocarrils de la Generalitat Valenciana) as the contracting authority.
Key project features:
• Construction of 1,131 meters of tramway track using PH37N rail with Pandrol-type encasement, 1,771 meters of slab track with continuously welded UIC 54 rail and DFF-ADH “top-down” direct fastening, and 7,051 meters of ballasted track with continuously welded UIC 54 rail and monobloc concrete sleepers on siliceous ballast.
The works were carried out in accordance with FGV’s BIM Manual, with VIRCORE serving as the CDE.