The joint venture formed by INGECID, DEGREE OF FREEDOM and A-INGENIA has been awarded a 15-month contract for site management, technical assistance and health and safety coordination services for the "Project to construct the Quisi Viaduct in the Calp-Teulada section of line 9 of the Alicante TRAM network". The tender process, in which a total of 5 bids were submitted, was managed by Ferrocarrils de la Generalitat Valenciana (FGV).

The restoration work carried out by FGV on the current Quisi viaduct, built between 1913 and 1915 on the line linking Alicante and Dénia, has allowed it to remain open for the circulation of trains. The Generalitat is planning investment to renovate the track and modify the viaduct and infrastructures to maintain the quality of service and bring the line up to the quality standards of the rest of the FGV network in Alicante.

These measures are being carried out on Line 9 (Benidorm-Denia) of the Alicante TRAM system in order to fully modernized it. The services contracted include site management, technical assistance and health and safety coordination services for construction work on the Quisi Viaduct in the Calp-Teulada section of line 9, as well as technical office support, including the implementation, monitoring and updating of the BIM execution plan. FGV has adopted BIM methodology for the drafting and execution of work under this contract and is committed to continuing to use this methodology throughout the life cycle of the infrastructure.

The works are located on Line 9 of the FGV TRAM network within the municipality of Benissa (Alicante), with a material execution budget of €8,354,262.37 and a duration of 12 months. The project involves the construction of 700 meters of meter-gauge track, including a new post-tensioned viaduct with a total length of 370 meters.


Imagen: Fuente FGV

 

One of the new Kukularra junction branches is open to traffic
INGECID, presente en la octava edición del “Nuclear Decommissioning & Waste Management Summit” del ACI

YOUR NEXT BIG PROJECT STARTS HERE

/ Let’s discuss how our solutions can help you achieve your goals.

/ Extensive experience across multiple sectors

LATEST NEWS

  • 22/07/2025
    ENEC engages INGECID to take part in a strategic study for spent fuel storage in the United Arab Emirates
  • 18/06/2025
    INGECID Internationalization Award at the Cantabria 2025 SME of the Year Awards
  • 13/03/2025
    INGECID at the "BIM methodology applied to public procurement” conference