The 370-meter viaduct comprises a continuous beam with a post-tensioned concrete box trough forming 8 spans (one 35-meter span at either end and six 50-meter spans). The viaduct is located downstream of the existing Santa Ana Bridge, with which it is aligned obliquely.
INGECID, together with its partners in the DEGREE OF FREEDOM and A-INGENIA joint venture, is responsible for site management, technical assistance and health and safety coordination services for the "Project for the construction of the Quisi Viaduct in the Calp-Teulada section of line 9 of the Alicante TRAM network", managed by Ferrocarrils de la Generalitat Valenciana (FGV).
El pasado 1 de diciembre, el equipo técnico de FGV visitó la obra del nuevo Viaducto del Barranco de Quisi. En palabras de nuestro director de obra, Iván Pernía, «las obras avanzan según lo establecido, cumpliendo los hitos programados»

Ivan Pernía, Director de obra

 

The joint venture formed by IDOM, WESTINGHOUSE and INGECID is awarded the contract for a support facility for the Santa María de Garoña Nuclear Power Plant's Individualized Temporary Storage unit
INGECID obtains funding through the call for Public-Private Collaboration Projects as part of the PROSA project

YOUR NEXT BIG PROJECT STARTS HERE

/ Let’s discuss how our solutions can help you achieve your goals.

/ Extensive experience across multiple sectors

LATEST NEWS

  • 22/07/2025
    ENEC engages INGECID to take part in a strategic study for spent fuel storage in the United Arab Emirates
  • 18/06/2025
    INGECID Internationalization Award at the Cantabria 2025 SME of the Year Awards
  • 13/03/2025
    INGECID at the "BIM methodology applied to public procurement” conference