/ Addressing complex challenges

RAILWAY INFRASTRUCTURE

RAILWAY ENGINEERING

At INGECID, we provide comprehensive solutions in railway engineering, covering project drafting, construction management, technical assistance, and safety and health coordination for railway works. We also have extensive experience in BIM implementation and consulting, ensuring maximum efficiency and quality at every stage of railway projects.
Our experience enables us to make swift decisions to deliver optimal and efficient solutions for our clients, while ensuring safety, quality, maintainability, and compliance with client requirements in the projects we develop.

/ Our Railway Services

MORE EFFICIENT TRANSPORT

We prepare complete and detailed projects for railway infrastructure, from preliminary studies to construction designs, ensuring efficient solutions tailored to each client’s needs.

We handle comprehensive management of railway construction works, ensuring compliance with deadlines, technical and regulatory quality, and resource optimization throughout all project phases.

We provide technical support during project development, offering specific and agile solutions for any challenge that may arise during the design or construction process.

We integrate tools such as 3D models, Virtual Reality, and Augmented Reality to improve visualization, optimize decision-making, and ensure precise planning in railway projects.

We manage safety and health on railway works with a proactive approach involving all parties, ensuring and supervising compliance with RD 1627/1997, all applicable contract regulations, the project ESS, and the construction site Safety and Health Plan.

/ Discover our projects

EVERY RAILWAY INFRASTRUCTURE IS UNIQUE. WE DESIGN TAILORED SOLUTIONS FOR EACH CHALLENGE

INGECID carried out construction management, technical assistance, and safety and health coordination for the Quisi Viaduct on behalf of FGV (Ferrocarriles de la Generalitat Valenciana), together with A-Ingenia and Degree of Freedom. The viaduct is 370 meters long with 8 spans (6 spans of 50 m and 2 spans of 35 m), supported by 7 piers and a reinforced and prestressed concrete box girder. The meter-gauge track was laid on this box girder, consisting of UIC 54 rail and monoblock concrete sleepers on siliceous ballast.

LEARN MORE

As a subcontractor to the joint venture (Vilor – CICASA – CRC), INGECID provided BIM consulting during the execution of the works, with FGV (Ferrocarrils de la Generalitat Valenciana) as the contracting authority.

LEARN MORE

Currently, INGECID, as part of a joint venture with its partners A-Ingenia, Degree of Freedom, and Meta, is leading construction management, technical assistance, and health and safety coordination for the track duplication and electrification project between Hospital Vila Halt and Benidorm Station. The contracting authority is Ferrocarrils de la Generalitat Valenciana (FGV).

LEARN MORE

YOUR NEXT BIG PROJECT STARTS HERE

/ Let’s discuss how our solutions can help you achieve your goals.

/ Extensive experience across multiple sectors

OTHER PROJECTS

  • Nuclear Engineering
    Decommissioning engineering for the Santa María de Garoña Nuclear Power Plant
  • Nuclear Engineering
    Strategic study for the storage of spent fuel at the Barakah Nuclear Power Plant
  • Ingeniería de Software, Ingeniería Nuclear
    VIRCORE FLYT: Comprehensive management of nuclear power plant decommissioning in Norway