The project involves redesigning the BI-4342 road between kilometric points 17+520 and 17+900 to adapt the section to new requirements arising from future industrial developments. Key actions include the construction of a segment of the Ibaizabal cycle path—partly running alongside the BI-4342—and the replacement of certain facilities at the Boroa toll plaza, adding one additional lane to the existing layout.

INGECID’s work focused on the following activities:

  1. Development of an initial model based on the original project data, which required substantial redesign during the early stages of construction due to major modifications in the project definition.
  2. Detection of clashes within the initial model, which, once resolved, resulted in the final construction start model.
  3. BIM-based construction monitoring, including the monthly development of a progressive As-built model to measure key work units and track certification progress. The process concluded with a comprehensive BIM model representing the as-executed works, fully equipped with property sets to support project understanding, integration with the infrastructure operator, and linkage to all documents generated throughout construction.
  4. Implementation, management, and monitoring of a BIM management system using the VIRCORE Common Data Environment.

YOUR NEXT BIG PROJECT STARTS HERE

/ Let’s discuss how our solutions can help you achieve your goals.

/ Extensive experience across multiple sectors

OTHER PROJECTS

  • Road Infrastructure
    BIM Management for the Construction Project of the A-67 Highway
  • Road Infrastructure
    BIM Management and Technical Support for the Road Construction Project on the Bilbao VSM