The 370-meter viaduct comprises a continuous beam with a post-tensioned concrete box trough forming 8 spans (one 35-meter span at either end and six 50-meter spans). The viaduct is located downstream of the existing Santa Ana Bridge, with which it is aligned obliquely.

INGECID, together with its partners in the DEGREE OF FREEDOM and A-INGENIA joint venture, is responsible for site management, technical assistance and health and safety coordination services for the "Project for the construction of the Quisi Viaduct in the Calp-Teulada section of line 9 of the Alicante TRAM network", managed by Ferrocarrils de la Generalitat Valenciana (FGV).
El pasado 1 de diciembre, el equipo técnico de FGV visitó la obra del nuevo Viaducto del Barranco de Quisi.
En palabras de nuestro director de obra, Iván Pernía, «las obras avanzan según lo establecido, cumpliendo los hitos programados»


Ivan Pernía, Director de obra



/ Extensive experience across multiple sectors